How to identify
MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR DEVELOPMENT OF PARK CONNECTORS IN SINGAPORE
MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR DEVELOPMENT OF PARK CONNECTORS IN SINGAPORE

OPEN
The information contained within the procurement notices/documents is intended for the sole purpose of suppliers preparing for their bids, and shall be used only for this intended purpose. They shall not be reproduced, distributed, adapted, modified, republished, displayed, broadcasted, hyperlinked, framed or transmitted in any manner or by any means without prior permission, other than for its intended purpose.
NPB000ETT26000055
NParks/N/12/2026
National Parks Board
07 Apr 2026 02:20PM
120 Days
* This is a QFM Tender. Only Multi-Disciplinary Teams of Consultants who were successfully shortlisted in the (NParks/E/8/2025) can participate in this tender. (1) Design Link Architects Pte. Ltd. (2) Team Design Architects Pte. Ltd. (3) A D Lab Pte. Ltd. (4) DP Architects Pte Ltd. (5) Interconsultants Pte. Ltd.
* Project brief will be provided via email to the Multi-Disciplinary Teams of Consultants who were successfully shortlisted in the EOI (NParks/E/8/2025).
* This is a Two Envelope Submission. "Price Schedule" and "Breakdown of Fee in Man-weeks and Man-weeks Rates" shall be submitted in the "Price" document type. All other submissions shall be submitted in the "Technical" document type.
Services
If the tender is a two envelope tender, you need to submit separate technical and price documents in your response.
Yes
Expenditure
Yes
Non Period Contract
Open Tender
If the tender allows request for proposal, suppliers can counter propose with different items as long as it fulfills the intended objective of the original item.
No
Please refer to the tender documents to find out if the Government Registration Authority (GRA) registration is a critical (i.e. mandatory), non-critical or fully exempted evaluation criterion.
PSPC_AR01 - Architectural Consultancy Services Panel 1 [Refer to selected PSPC Panel]
PSPC_CS02 - Civil Structuring Engineering Consultancy Services Panel 2 [Refer to selected PSPC Panel]
PSPC_CS01 - Civil Structuring Engineering Consultancy Services Panel 1 [Refer to selected PSPC Panel]
PSPC_ME01 - Mechanical & Elect. Engineering Consultancy Services Panel 1 [Refer to selected PSPC Panel]
PSPC_ME02 - Mechanical & Elect. Engineering Consultancy Services Panel 2 [Refer to selected PSPC Panel]
PSPC_QS01 - Quantity Surveying Consultancy Services Panel 1 [Refer to selected PSPC Panel]
PSPC_QS02 - Quantity Surveying Consultancy Services Panel 2 [Refer to selected PSPC Panel]
PSPC_AR02 - Architectural Consultancy Services Panel 2 [Refer to selected PSPC Panel]
Services ⇒ Professional Services
Closing on
04 Jun 2026
04:00PM
(updated)
Electronic Submission
LOADING
(Please log in to view the Documents)
LOADING
TENDER DOCUMENTS
(Please log in to view the Documents)
LOADING
WHO TO CONTACT
(For all queries pertaining to this tender, please seek clarification from the person(s) listed below.)
JOEL WONG
joel_wong@nparks.gov.sg
64650367
Headquarters, Singapore Botanic Gardens, 1 Cluny Road, Singapore 259569
AWARDING AGENCY
National Parks Board
CONTACT PERSON'S DETAILS
JOEL WONG
joel_wong@nparks.gov.sg
64650367
Headquarters, Singapore Botanic Gardens, 1 Cluny Road, Singapore 259569
MANUAL COLLECTION INFORMATION
(Inclusive of GST)
Shortlisted tenderers can download "N_12_2026 Tender Document" via GeBIZ, and the General Project Brief will be sent via email by NParks.
ITEMS TO RESPOND
1
Item No. 1
Mandatory to Bid: Yes
[Required Services] Proposed Lump Sum fee shall be $____________________ for the Preliminary Design Stage for Package 1
LOT
1.0000
2
Item No. 2
Mandatory to Bid: Yes
[Optional Services] Proposed consultancy service fees for Design Stage, Tender Stage, Construction Stage and Post Construction Stage shall be _____________________% of the Final Project Construction Cost for Package 1
LOT
1.0000
3
Item No. 3
Mandatory to Bid: Yes
[Required Services] Proposed Lump Sum fee shall be $____________________ for the Preliminary Design Stage for Package 2
LOT
1.0000
4
Item No. 4
Mandatory to Bid: Yes
[Optional Services] Proposed consultancy service fees for Design Stage, Tender Stage, Construction Stage and Post Construction Stage shall be _____________________ % of the Final Project Construction Cost for Package 2
LOT
1.0000