How to identify
TENDER FOR TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST PREFABRICATED BATHROOM UNIT (PBU) TO VARIOUS HDB BUILDING SITES (BATCH 1)
TENDER FOR TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST PREFABRICATED BATHROOM UNIT (PBU) TO VARIOUS HDB BUILDING SITES (BATCH 1)

OPPORTUNITY DETAILS

OPEN
The information contained within the procurement notices/documents is intended for the sole purpose of suppliers preparing for their bids, and shall be used only for this intended purpose. They shall not be reproduced, distributed, adapted, modified, republished, displayed, broadcasted, hyperlinked, framed or transmitted in any manner or by any means without prior permission, other than for its intended purpose.
HDB000ETT26000152
BRI-TN260015
Housing and Development Board
28 Aug 2026 10:20AM
5 Months
PQM to be used for evaluation of this Tender.
Construction Services
If the tender is a two envelope tender, you need to submit separate technical and price documents in your response.
Yes
Expenditure
Yes
Non Period Contract
Open Tender
If the tender allows request for proposal, suppliers can counter propose with different items as long as it fulfills the intended objective of the original item.
No
Please refer to the tender documents to find out if the Government Registration Authority (GRA) registration is a critical (i.e. mandatory), non-critical or fully exempted evaluation criterion.
CW01 - General Building [$50,000,000 (BCA B1)]
CR10A - Automated Precast Concrete Production [Not Applicable (BCA Single Grade)]
Construction ⇒ Others
Closing on
05 Oct 2026
04:00PM
Electronic Submission
Site Briefing on
03 Sep 2026
10:00AM
LOADING
TENDER DOCUMENTS
(Please  log in to view the Documents)
LOADING
WHO TO CONTACT
(For all queries pertaining to this tender, please seek clarification from the person(s) listed below.)
CHEW KENG KEONG
CHEW_Keng_Keong@hdb.gov.sg
60564744
BRI, HDB Hub
AWARDING AGENCY
Housing and Development Board
CONTACT PERSON'S DETAILS
THE PROCUREMENT OFFICE, PROCUREMENT & CONTRACTS GROUP, BASEMENT 1, HDB HUB, 480 LORONG 6 TOA PAYOH, SINGAPORE 310480.
SITE BRIEFING
No
03 Sep 2026
10:00AM
Tenderers are to refer to the Covering Letter for full details of the site showround.
CONTACT PERSON'S DETAILS
CHEW KENG KEONG
CHEW_Keng_Keong@hdb.gov.sg
60564744
BRI, HDB Hub
ITEMS TO RESPOND
1
Item No. 1
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Simplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (Below 20 Storey)
CUBIC METER
2,000.0000
2
Item No. 2
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Simplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (20 to 29 Storey)
CUBIC METER
2,000.0000
3
Item No. 3
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Simplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (30 to 39 Storey)
CUBIC METER
2,000.0000
4
Item No. 4
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Simplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (40 Storey and above)
CUBIC METER
1,000.0000
5
Item No. 5
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Duplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (Below 20 Storey)
CUBIC METER
4,000.0000
6
Item No. 6
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Duplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (20 to 29 Storey)
CUBIC METER
4,000.0000
7
Item No. 7
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Duplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (30 to 39 Storey)
CUBIC METER
4,000.0000
8
Item No. 8
Mandatory to Bid: Yes
Precast Prefabricated Bathroom Unit (Duplex PBU Module), excluding M&E fittings, sanitary fixtures and architectural finishes. Grade 40 Concrete Building Height (40 Storey and above)
CUBIC METER
2,000.0000
9
Item No. 9
Mandatory to Bid: Yes
If Grade 50 concrete is required, the additional amount to be added over the Grade 40 price
CUBIC METER
1,000.0000
10
Item No. 10
Mandatory to Bid: Yes
If Grade 60 concrete is required, the additional amount to be added over the Grade 40 price
CUBIC METER
1,000.0000